
The Sutherland Hospital
We successfully delivered detailed HVAC drafting for the Sutherland Hospital Operating Theatre Upgrade, featuring 12 new operating theatres, 3 wards, isolation rooms, and a kitchen.
View Details →
Leading HVAC Design & Drafting Experts in Sydney


We successfully delivered detailed HVAC drafting for the Sutherland Hospital Operating Theatre Upgrade, featuring 12 new operating theatres, 3 wards, isolation rooms, and a kitchen.
View Details →
We Successfully completed 3 story Educational building in Canberra, Australia
View Details →
We successfully completed Stage 1 Mechanical Services New Amphibian and Reptile Conservation Center located at the center of Taronga Zoo
View Details →We develop high-quality 3D BIM models for HVAC systems with the required Level of Development (LOD 200–500), ensuring every component is accurately represented for design, coordination, fabrication, and facility management purposes.
Our team ensures complete integration of HVAC systems with architectural, structural, and other MEP disciplines. Using advanced coordination tools, we detect and resolve clashes early, reducing rework and ensuring a smooth construction process.
We produce detailed mechanical drawings, schedules, and fabrication documents directly from the BIM model, maintaining precision and consistency. All documentation follows client standards and project specifications for seamless on-site execution.
We provide on-site survey and verification services to ensure that installations match the approved BIM model. As-built models are updated to reflect real-world conditions, supporting accurate facility handover and asset management.